Industry Insights

23 Questions to Ask a Vending Machine Factory Before You Pay

By Futureino Team10 min read
The Futureino training room in Guangzhou where operators are walked through their machines

There are 23 questions worth asking a vending machine factory before you pay anything, and six of them belong in a written document rather than a chat thread. The list below is the one we get asked, grouped by subject, with the answer you should be listening for and ours next to it. Use it on every supplier you are considering, including us. A factory that has built the capability answers in specifics; one that has not answers in adjectives, and that difference is the whole point of the exercise.

The company: 1 to 4

These come first because everything after them is worthless if the company is not what it says. The full method is in the factory verification walkthrough; here are the four questions in short form.

Questions 1 to 4: is this a factory at all
AskListen forOur answer
1. Are you the manufacturer or a trading company?A direct answer, and a willingness to prove it on videoManufacturer. Three facilities in Guangzhou, over 20,000 m² combined
2. Can I see the business licence and the credit code?Documents sent, not promisedSent with the quote, along with certificates
3. How many of this exact model have you built?A number, and a shrug if it is smallVaries by model. Cotton candy is past 1,000 units, perfume and protein shake past 500 each
4. Who else buys from you, and do they reorder?Repeat business, not a list of logosDistributors reordering 80+, 50+ and 30+ machines monthly in Europe, the US and Saudi Arabia

The machine: 5 to 10

  • 5. What are the exact dimensions and the crated dimensions? You need both. The machine fits the venue; the crate fits the door and the lift. Our published figures are factory-verified per model, and the crate size comes with the packing list.
  • 6. What is the power draw at what voltage? A cotton candy robot pulls 2,488 W, which is 23 A at 110 V and 11 A at 220 V. That is a circuit conversation with the venue, not a footnote.
  • 7. What is the real capacity per fill? Ask in servings, not in litres. 200 servings on the cotton candy robot, 70 cups on the popcorn machine, 1,000+ sprays on the perfume station.
  • 8. How long does one cycle take? This decides queue length at peak. Three minutes for spun cotton candy, 90 seconds for popcorn, 15 seconds for a photo print.
  • 9. What are the consumables and where do I buy them? Tied supply is a legitimate business model but you should know before, not after.
  • 10. Can I see this exact model running on video, today? Not a render, not a sibling model.

Certification and compliance: 11 to 13

Question 11: which certifications does this model carry, and can I see the certificate with the model number on it. Question 12: if my market needs something you do not have, who pays for it. Question 13: what documentation comes with the shipment for customs.

Ours: CE on all machines, some with additional country-specific certificates. Anything else can be obtained on request, with the client covering the cost, or us covering it on a large order. The trap to avoid is a supplier who claims every certification for every model and produces no paperwork. What CE actually means for an imported machine is worth reading before you ask.

Money and terms: 14 to 17

These four belong in writing. Every one of them is something buyers and suppliers argue about after the fact.

Questions 14 to 17: the commercial terms, in writing
AskListen forOur answer
14. What Incoterm is this price?A named term, and clarity on what it excludesEXW Guangzhou unless quoted otherwise: the machine at our door, freight and duty yours
15. What is the deposit and when is the balance due?A balance triggered by a milestone, not a date30 to 40% deposit, balance after you have seen the finished machine on a video call
16. What payment methods do you accept?At least one with buyer protectionBank transfer, Alibaba with Trade Assurance, and credit card via Alibaba
17. Is the receiving account in the same company name?Yes, with no explanation neededYes

Question 15 is the one that protects you most and gets asked least. A balance due on a calendar date pays for a machine you have not seen; a balance due after QC pays for one you have. The deposit safety guide covers the sequence in full, and the Incoterms explainer covers why two quotes are rarely comparable as written.

Production and delivery: 18 to 20

Question 18: how long is production for this model, from cleared deposit. Question 19: what happens between the machine being finished and it leaving. Question 20: what do I receive when it ships.

Our sequence, for reference: deposit clears, production runs under 30 days, then a video call showing your finished machine, then US-level QC, then the balance, then packing and shipping handled by us with tracking shared throughout, then installation and training videos, then support through the install itself. If a supplier cannot describe their equivalent of that sequence step by step, they have not done it often.

After the sale: 21 to 23

  • 21. What does the warranty cover, in a list, and for how long? Ours is a full year: free support, free spare parts, and replacement of whole components that burned out or failed from an internal fault. Unlike most factories we treat that as included rather than as something to argue about.
  • 22. How do spare parts reach me and how fast? Ours ship from Guangzhou in 7 to 14 days depending on country, a free starter parts kit comes in the crate, and we recommend buying an extra kit upfront for wear items.
  • 23. What happens if the machine arrives faulty? The question that separates suppliers. Around 1 in 75 of ours arrives with a fault, against an industry pattern closer to 1 in 10 in our experience, and when it happens we take responsibility rather than start a conversation about who is to blame.

Support is also where most faults are resolved without a part moving at all. We run live chat and video calls with English-speaking technicians, can connect to a machine remotely to diagnose it, and put complex issues on a ticket system so they do not vanish into a chat thread. The full after-sales standard spells out what good looks like line by line.

The six answers to get in a document

If you do nothing else on this page, get these written down and signed: the price with its Incoterm (14), the deposit and balance trigger (15), the production window (18), the warranty scope and length (21), spare parts cost and delivery time (22), and the arrival-damage process (23). Everything else can live in a call summary. Those six are where money gets lost.

Before you send the list

Make sure the company is real first, or you will be collecting careful answers from a website. Start with the six verification checks, then shortlist using the survey of Chinese manufacturers. If durability is your specific worry, we wrote an honest answer on what actually fails and how often. Prices for every model we build are in the published price list.

Frequently Asked Questions

How many questions is too many for a supplier?

None of these will annoy a factory that wants the order. We answer this list several times a week and it takes about half an hour. A supplier who treats a structured question list as an insult is telling you how the next problem will be handled.

Which single question is the most revealing?

What exactly happens if the machine arrives faulty. It forces the supplier to describe a process they either have or do not have. Our answer is that we take responsibility, ship the part or the component, and stay on video until it runs. Roughly 1 in 75 of our machines arrives with a fault.

Should I ask these questions before or after the quote?

Before the deposit, after the first quote. The quote tells you the price and the Incoterm; this list tells you what the price includes. Asking early also saves you from spending two weeks negotiating with a supplier who was never going to meet your terms.

What answers should make me walk away?

Adjectives instead of specifics, a refusal to put warranty terms in a document, a bank account in a name other than the selling company, and any pressure to pay quickly. Vagueness about spare parts is the quiet one that hurts most a year later.

Do I need all 23 answers in writing?

The commercial ones, yes: price and Incoterm, deposit split, production window, warranty scope, parts cost and delivery time, and what happens on arrival damage. Those six are the ones people argue about later. The rest can live in a call summary.

Send us all 23

We answer this list several times a week and it takes about half an hour. Copy it into an email and we will reply in writing.

Request a quote

Get your factory-direct price.

Pricing, the lead time to your address and what is available right now — Daisy handles it from the factory side and replies within 24 hours.

Daisy
DaisySenior Sales Manager · Replies in English